| Sign In | Join Free | My infospaceinc.com |
|
Brand Name : Huashida
MOQ : 1
Delivery Time : 2 months
Certification : CE, ISO9001:2008
Place of Origin : CHINA
Model Number : 58-4200mm
Payment Terms : T/T
Packaging Details : according to customer's requirement
Price : 220000-350000$
Supply Ability : 20 Sets/Year
3PE Steel Pipe Anti-corrosion Coating Processing Line
Advantages of 3-layer PE coating
The three-layer polyethylene anti-corrosion coating combines the excellent properties of epoxy coating and extruded polyethylene layer: the interface characteristics and chemical resistance of the epoxy coating and the mechanical protection characteristics of extruded polyethylene layer. Therefore, it is very superior as the outer protective layer of buried pipelines. After rigorous scientific testing, the three-layer PE coating can make the life of the buried pipeline reach 50 years. At present, it is recognized as an efficient external pipeline anti-corrosion technology in the world.
Steel pipe with 3-layer PE coating (3PE) is widely used in pipeline systems for the transmission of oil, gas, water, and other fluids. They have high resistance to corrosive from chemicals, moisture, harmful environment etc.
The structure of 3-layer PE coating (3PE)
3-layer PE anti-corrosion coating consists of three layers:
1. FBE (Fusion bonded epoxy) coating, FBE>100um
2. Adhesive layer, 170~250um
3. Polyethylene layer, 1.8~3.7mm
The three layers are integrated and firmly combined with the steel pipe to form an excellent anti-corrosion coating.

3-layer PE coating working process
Upload pipes→pipes screw conveyor→rust removal → intermediate frequency heating→Epoxy powder coating→Adhesive & polyethylene coating→cooling spray→pipes screw conveyor→Pipe end beveling→unload pipes

Main Equipment of 3PE anticorrosion processing
Configuration List
|
No. |
Name |
Set |
|
A. Derusting Equipment |
||
|
1 |
Pipe-converying Equipment |
1 |
|
2 |
Shot Blast Cleaning Machine |
1 |
|
3 |
Cyclone Dust Collector |
1 |
|
4 |
Pulse dust collector |
1 |
|
5 |
Centrifugal exhaust fan |
1 |
|
6 |
Rust removal equipment PLC |
1 |
|
B. Coating equipment |
||
|
1 |
Coating transfer equipment |
1 |
|
2 |
IF heating device |
1 |
|
3 |
Powder spraying device |
1 |
|
4 |
Automatic loading dryer |
2 |
|
5 |
SJ-65/30 Extruder |
1 |
|
6 |
SJ-180/30 Extruder |
1 |
|
7 |
Hot melt adhesive extruder die |
1 |
|
8 |
PE sheet extruder head mold |
1 |
|
9 |
Hot melt adhesive/PE sheet coating device |
1 |
|
10 |
Environmental Protection Ventilation equipment |
1 |
|
11 |
Cooling Spray equipment |
1 |
|
C.Platform Equipment |
||
|
1 |
Steel pipe platform |
1 |
|
2 |
Post-rust removal transition platform |
1 |
|
3 |
Product tube storage platform |
1 |
|
4 |
Hydraulic Equipment |
3 |
|
D.Groove Equipment |
||
|
1 |
PE Beveling Machine |
2 |
|
2 |
Hydraulic Lifting and Turning Machinery |
1 |
|
3 |
Hydraulic Equipment |
1 |
|
4 |
PLC |
1 |
|
E.Compressed air Equipment |
||
|
1 |
Screw Air Compressor |
1 |
|
2 |
Cold dry machine |
1 |
|
3 |
Precision filters |
3 |
|
4 |
Gas tanks |
1 |
Question & Answer:
Q1. What is shot blasting grade?
A: SA2.5
Q2. What is Delivery Time?
A: 2-3monthes after deposit.
Q3. Production output
A: It is different output capability for pipe with different diameters, the Max.capability is 3 to 8 km/day, and the annual processing capacity is 2 million square meters (Φ508 mm).
Q4. After-sales service:
A: Warranty period:
Before delivery, all the equipment must be trial operated to confirm the quantity perfectly.
The warranty period is 12 months from the picking-up date for the mechanical parts, and 6 months for the electrical parts.
|
|
3PE Steel Pipe Anti-corrosion Coating Processing Line Images |