Sign In | Join Free | My infospaceinc.com
China Qingdao Huashida Machinery Co., Ltd. logo
Qingdao Huashida Machinery Co., Ltd.
Pipeline Anticorrosion Thermal insulation Pipe production lineMACHINERY MANUFACTURER
Verified Supplier

2 Years

Home > 3LPE Coating Pipe Production Line >

3lpe Pipe Machine Steel Pipe Blasting Machine In Oil Gas Pipeline

Qingdao Huashida Machinery Co., Ltd.
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

3lpe Pipe Machine Steel Pipe Blasting Machine In Oil Gas Pipeline

  • 1
  • 2
  • 3

Brand Name : HUASHIDA

Certification : ISO9001

Place of Origin : Qingdao,Shandong,China

MOQ : 1

Payment Terms : L/C

Delivery Time : come to an agreement in respect of the delivery time

Packaging Details : Packing according to Machine

Heating Method : Induction Heating

Production_Speed : 10-20m/min

Capacity : 100-200 meters per hour

Coating Structure : Epoxy+Adhesive+PE

Contact Now

External FBE Coating Equipment,Maneuverable PP Coating Equipment For Steel Pipe

INTRODUCTION

3PE anti-corrosion pipeline with three-layer PE anti-corrosion structure
First layer: epoxy powder (FBE>100um),
Second layer: Adhesive (AD) 170-250um,
Third layer: Polyethylene (PE) 2.5-3.7mm
The three materials are integrated and firmly bonded with the steel pipe to form an excellent anti-corrosion layer. The pipe diameter range is between 60 and 2820, and the wall thickness range is between 2.5-18mm. This is a good anti-corrosion method that can generally increase the service life by 50 years. It not only extends the replacement cycle of underground pipeline equipment, but also greatly saves costs, providing a strong role in national construction!

3lpe Pipe Machine Steel Pipe Blasting Machine In Oil Gas Pipeline
Description:
3PE anti-corrosion coating production line means the steel pipe is protected by three layer to prolong the life of use from 5-10years to 50-100years.
First layer is Fusion bonded epoxy layer (FBE> 100µm), the second layer of adhesive (AD) 170 ~ 250µm, the third layer of polyethylene (PE) 2.5 ~ 3.7mm. Present we can made the machinery for diameter range Φ159 ~ Φ1220.
3PE steel pipe outer coating has a high mechanical strength, excellent electrical insulation performance. The merits include high degree of mechanization, process parameters stable, not pollute the environment, etc. In recent years, the intensive of the pipeline corrosion engineering has been widely used.
3lpe Pipe Machine Steel Pipe Blasting Machine In Oil Gas Pipeline

3lpe Pipe Machine Steel Pipe Blasting Machine In Oil Gas Pipeline

No. Name Set
A. Derusting Equipment
1 Pipe-converying Equipment 1
2 Shot Blast Cleaning Machine 1
3 Cyclone Dust Collector 1
4 Pulse dust collector 1
5 Centrifugal exhaust fan 1
6 Rust removal equipment PLC 1
B. Coating equipment
1 Coating transfer equipment 1
2 IF heating device 1
3 Powder spraying device 1
4 Automatic loading dryer 2
5 SJ-65/30 Extruder 1
6 SJ-180/30 Extruder 1
7 Hot melt adhesive extruder die 1
8 PE sheet extruder head mold 1
9 Hot melt adhesive/PE sheet coating device 1
10 Environmental Protection Ventilation equipment 1
11 Cooling Spray equipment 1
C.Platform Equipment
1 Steel pipe platform 1
2 Post-rust removal transition platform 1
3 Product tube storage platform 1
4 Hydraulic Equipment 3
D.Groove Equipment
1 PE Beveling Machine 2
2 Hydraulic Lifting and Turning Machinery 1
3 Hydraulic Equipment 1
4 PLC 1
E.Compressed air Equipment
1 Screw Air Compressor 1
2 Cold dry machine 1
3 Precision filters 3
4 Gas tanks 1


3lpe Pipe Machine Steel Pipe Blasting Machine In Oil Gas Pipeline

The technological processes employed by Huashida Machinery for the 3LPE coating of steel pipes involve a series of meticulous steps designed to ensure the highest level of quality and durability. Here's a detailed overview of the process:

  1. Upload Pipes:
    • The process begins with the loading of the steel pipes onto the production line. This step ensures that the pipes are positioned correctly and ready for processing.
  2. Pipes Screw Conveyor:
    • Once loaded, the pipes are transported through the production line using a screw conveyor. This efficient system gently moves the pipes forward, allowing for continuous and uninterrupted processing.
  3. Rust Removal via Intermediate Frequency Heating:
    • To ensure a smooth and even coating, it's crucial to remove any rust or impurities from the pipe surface. This is achieved through intermediate frequency heating, which raises the temperature of the pipe surface to effectively burn off rust and contaminants.
  4. Epoxy Powder Coating:
    • Following rust removal, the pipes are coated with an epoxy powder primer. This layer acts as a corrosion-resistant barrier, providing a strong foundation for the subsequent coatings.
  5. Outer Layer Solidification & Polyethylene Coating:
    • Next, the pipes undergo the application of the outer layer, which consists of a solidified coating and a polyethylene layer. The solidification process ensures that the coating adheres firmly to the pipe surface, while the polyethylene layer provides additional protection against corrosion and wear.

3lpe Pipe Machine Steel Pipe Blasting Machine In Oil Gas Pipeline

3lpe Pipe Machine Steel Pipe Blasting Machine In Oil Gas Pipeline
3lpe Pipe Machine Steel Pipe Blasting Machine In Oil Gas Pipeline
3lpe Pipe Machine Steel Pipe Blasting Machine In Oil Gas Pipeline
3lpe Pipe Machine Steel Pipe Blasting Machine In Oil Gas Pipeline


Product Tags:

3lpe pipe blasting equipment

      

Oil Gas Pipeline pipe blasting equipment

      
Quality 3lpe Pipe Machine Steel Pipe Blasting Machine In Oil Gas Pipeline for sale

3lpe Pipe Machine Steel Pipe Blasting Machine In Oil Gas Pipeline Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Qingdao Huashida Machinery Co., Ltd.
*Subject:
*Message:
Characters Remaining: (0/3000)